117 questions
Practise this subject
Questions
COCOMO stands for____________________?
Show answer
Answer:
Constructive cost model
Which one is not a risk management activity ?
Show answer
Answer:
Risk generation
Which of the following uses empirically derived formulas to predict effort as a function of LOC or FP ?
Show answer
Answer:
Both FP-Based Estimation and COCOMO
Which version of COCOMO states that once requirements have been stabilized, the basic software architecture has been established ?
Show answer
Answer:
Early design stage model
Which model was used during the early stages of software engineering, when prototyping of user interfaces, consideration of software and system interaction, assessment of performance, and evaluation of technology maturity were paramount ?
Show answer
Answer:
Application composition model
COCOMO was developed initially by _____________________ ?
Show answer
Answer:
B.W.Bohem
COCOMO-II was developed at _____________________?
Show answer
Answer:
University of Southern California
What all has to be identified as per risk identification ?
Show answer
Answer:
All of the mentioned
Which one is not a size measure for software product ?
Show answer
Answer:
Cyclomatic Complexity
Estimation of size for a project is dependent on___________________?
Show answer
Answer:
None of the mentioned
Which one is not a stage of COCOMO-II ?
Show answer
Answer:
Early design estimation model
Which model assumes that systems are created from reusable components, scripting or database programming ?
Show answer
Answer:
An application-composition model
Which model is used during early stages of the system design after the requirements have been established ?
Show answer
Answer:
An early design model
Which model is used to compute the effort required to integrate reusable components or program code that is automatically generated by design or program translation tools ?
Show answer
Answer:
A reuse model
Which of the following states that work expands to fill the time available ?
Show answer
Answer:
Parkinson’s Law
Which technique is applicable when other projects in the same analogy application domain have been completed ?
Show answer
Answer:
Estimation by analogy
Which of the following costs is not part of the total effort cost ?
Show answer
Answer:
Costs of lunch time food
A _______________ is developed using historical cost information that relates some software metric to the project cost ?
Show answer
Answer:
Algorithmic cost modelling
A number of independent investigators have developed a team-oriented approach to requirements gathering that can be applied to establish the scope of a project called ?
Show answer
Answer:
FAST
CLSS stands for_____________________?
Show answer
Answer:
conveyor line sorting system
‹ Previous
1
…
3
4
5
6
Next ›
Home
Practice
Tests
Browse
Sign in
You are offline. Your answers are kept on this device and will sync when you are back online.
Install PakMCQ App
Practice faster with offline access!
Install
×
×
Install PakMCQ
Add to your iPhone / iPad Home Screen
1
Tap the
Share
button
at the bottom of Safari
2
Scroll down and select
Add to Home Screen
3
Tap
Add
in the top-right corner