Questions
Pick up the item of work not included in the plinth area estimate______________?
Show answer
Answer:
Courtyard area
If B is the width of formation, d is the height of the embankment, side slope S : 1, for a highway with no transverse slope, the area of cross-section is___________________?
Show answer
Answer:
Bd + Sd2
period in a septic tank is assumed___________________?
Show answer
Answer:
30 minutes
Pick up the incorrect statement regarding a master trap from the following ?
Show answer
Answer:
The water seal is less than that of ordinary traps
The diameter of a domestic sewer pipe laid at gradient 1 in 100 is recommended___________________?
Show answer
Answer:
150 mm
Pick up the correct statement from the following?
Show answer
Answer:
All the above
The order of booking dimensions is________________?
Show answer
Answer:
Length, breadth, height
The ‘centre line method’ is specially adopted for estimating_________________?
Show answer
Answer:
All the above
The inspection pit or chamber is a manhole provided in a base drainage system________________?
Show answer
Answer:
All the above
In case of laying gullies, siphons, intercepting traps, the cost includes_______________?
Show answer
Answer:
All of these
Carpet area does not include the area of_________________?
Show answer
Answer:
All the above
The expected out turn of 12 mm plastering with cement mortar is_______________?
Show answer
Answer:
8.0 sq m
The measurement is made for stone work in square metre in case of________________?
Show answer
Answer:
A. and D. of the above
The total length of a cranked bar through a distance D. at 45° in case of a beam of effective length L, is_________________?
Show answer
Answer:
L + (2 × 0.42 d)
The concrete work for the following part of the building of specified thickness is measured in square metres_______________?
Show answer
Answer:
All the above
A portion of an embankment having a uniform up-gradient 1 in 500 is circular with radius 1000 m of the centre line. It subtends 180° at the centre. If the height of the bank is 1 m at the lower end, and side slopes 2:1, the earth work involved ?
Show answer
Answer:
27,500 m3
Anti-siphonage pipe is connected to__________________?
Show answer
Answer:
Top of P trap W.C.
The reduced levels of points, 30 metres apart along the longitudinal section of a road portion between chainages 5 and 9 are shown in the given figure. If there is a uniform up-gradient of the road 120 in 1, the chainage of the point with no filling or cutting is__________________?
Show answer
Answer:
(6 + 12) chains
The item of the brick structure measured in sq.m, is___________________?
Show answer
Answer:
Broken glass coping
According to ISI method of measurement, the order of the sequence is_________________?
Show answer
Answer:
Length, breadth, height
‹ Previous
1
2
3
4
Next ›
Home
Practice
Tests
Browse
Sign in
You are offline. Your answers are kept on this device and will sync when you are back online.
Install PakMCQ App
Practice faster with offline access!
Install
×
×
Install PakMCQ
Add to your iPhone / iPad Home Screen
1
Tap the
Share
button
at the bottom of Safari
2
Scroll down and select
Add to Home Screen
3
Tap
Add
in the top-right corner