Which of the following structures protects the shore by trapping of littoral drift?
Show answer
Answer:
groynes
Assertion A : Large size stones are required in stone revetment in shore protection. Reason R : Resistance of stone to wave force is proportional to its volume and wave force is proportional to the exposed area of the stone?
Show answer
Answer:
Both A and R are true and R is the correct explanation of A
Which of the following structures are constructed parallel to shore line to develop a demarcating line between land area and water area ?
Show answer
Answer:
sea walls, bulk heads and revetments
Which of the following is a fixed type mooring accessory ?
Show answer
Answer:
bollard
In multiple point mooring system, vessel is secured to minimum of____________________?
Show answer
Answer:
four points
If the maximum spring rise is 2 m and height of the waves expected is 4 m , then the breakwater height above the datum will be_________________?
Show answer
Answer:
7 m
As compared to wall type breakwater, mound type breakwater_________________?
Show answer
Answer:
results in less damage due to gradual failure
Minimum width of ship clearance shall be__________________?
Show answer
Answer:
B or 30 m
At a given port, the fetch is 400 nautical miles, the maximum height of storm wave will be_______________?
Show answer
Answer:
9.144 m
Assertion A : Intervention of undulations in the sea bed reduces the depth of wave at the section. Reason R : No wave can have a height greater than the depth of water through which it passes?
Show answer
Answer:
Both A and R are true and R is correct explanation of A.
As per Stevenson’s empirical formula, the approximate value of the height of the wave in metres is given by__________________?
Show answer
Answer:
0.34 VF
The minimum diameter of turning besin, where ships turn by going ahead and without tug assistance should be___________________?
Show answer
Answer:
4.0 L
When a ship floats at its designed water line, the vertical distance from water line to the bottom of the ship is known as________________?
Show answer
Answer:
draft
‹ Previous
1
2
Home
Practice
Tests
Browse
Sign in
You are offline. Your answers are kept on this device and will sync when you are back online.
Install PakMCQ App
Practice faster with offline access!
Install
×
×
Install PakMCQ
Add to your iPhone / iPad Home Screen
1
Tap the
Share
button
at the bottom of Safari
2
Scroll down and select
Add to Home Screen
3
Tap
Add
in the top-right corner