Skip to content
Sign in
Civil Engineering

The last reading before shifting the instrument?

Tap an option to check the answer. You can also press A–D.

Explanation
Taken on a Change Point (CP) Marks the end of a level setup. Used to calculate the reduced level before moving the instrument.