Mechanical Engineering Share PERT analysis is based on____________________? A optimistic time Option A B pessimistic time Option B C most likely time Option C D all of the above Option D E none of the above Option E Tap an option to check the answer. You can also press A–D. No explanation yet. Suggest one Bookmark Report an error Share