Skip to content
Sign in
Civil Engineering PPSC

In chain survey the area is divided into?

Tap an option to check the answer. You can also press A–D.

Explanation
In chain surveying, the area is divided into a framework of triangles.Because triangles are simple to measure and plot accurately.The preferred method is triangulation, using measured survey lines and offsets to locate details.Well-conditioned triangles, ideally with angles between 30∘ and 120∘, help reduce measurement errors.Last verified on 16-10-2026